Gefion Gymnasium
We developed and delivered a customised training tool based on a design by Schul Landscape Architects.
The structure is built with a focus on both functionality and durability, and is heavily dimensioned to carry TRX training straps. All training elements are made of stainless steel - a material that combines high durability with comfort and aesthetics.
The vertical columns are made of Ø100 mm steel tubes with welded, closed ends that protect against dirt and moisture.
The horizontal posts are carefully adapted to their function to provide a comfortable and secure grip. The surfaces are polished and free of burrs, making them ideal for direct hand contact training.
Contact
contact@elverdal.com
Location
Øster Voldgade 10,
1350 Copenhagen, Denmark
Year of construction
2024
Reference number
9360